3 pre-start inspection, Pre-start inspection -4, Inspection and maintenance table -3 – JLG 3248RS/10RS Operator Manual User Manual

Page 25

Advertising
background image

SECTION 2 - USER RESPONSIBILITIES, MACHINE PREPARATION AND INSPECTION

3121272

– JLG Lift –

2-3

2.3

PRE-START INSPECTION

The Pre-Start Inspection should include each of the following:

Table 2-1. Inspection and Maintenance Table

TYPE

FREQUENCY

PRIMARY

RESPONSIBILITY

SERVICE

QUALIFICATION

REFERENCE

Pre-Start Inspection

Before using each day; or
whenever there’s an Operator change.

User or Operator

User or Operator

Operation and Safety Manual

Pre-Delivery Inspection
(see note below)

Before each sale, lease, or rental delivery.

Owner, Dealer, or User Qualified JLG

Mechanic

Service and Maintenance Manual and
applicable JLG inspection form

Frequent Inspection

In service for 3 months or 150 hours, whichever comes
first; or Out of service for a period of more than 3
months; or Purchased used.

Owner, Dealer, or User Qualified JLG

Mechanic

Service and Maintenance Manual and
applicable JLG inspection form

Annual Machine
Inspection
(see note below)

Annually, no later than 13 months from the date of
prior inspection.

Owner, Dealer, or User Factory Trained Ser-

vice Technician
(Recommended)

Service and Maintenance Manual and
applicable JLG inspection form

Preventative Maintenance

At intervals as specified in the Service and Mainte-
nance Manual.

Owner, Dealer, or User Qualified JLG

Mechanic

Service and Maintenance Manual

NOTE:

Inspection forms are available from JLG. Use the Service and Maintenance Manual to perform inspections.

JLG INDUSTRIES, INC. RECOGNIZES A FACTORY-TRAINED SERVICE TECHNICIAN AS A PERSON WHO HAS SUCCESSFULLY COMPLETED THE JLG SERVICE TRAINING SCHOOL FOR
THE SPECIFIC JLG PRODUCT MODEL.

NOTICE

Advertising
This manual is related to the following products: