JLG 41AM (3120752) Service Manual User Manual

Page 27

Advertising
background image

SECTION 2 - SERVICE PROCEDURES

3120752

– JLG Lift –

2-3

Table 2-2. AM Model - Preventive Maintenance & Inspection Schedule.

AREA ON MACHINE

INTERVAL

PRE-START (1)

INSPECTION

WEEKLY

PREVENTATIVE

MAINTENANCE

3 MONTH

PREVENTATIVE

MAINTENANCE

PRE-DELIVERY (2)
OR FREQUENT (3)

INSPECTION

ANNUAL (4)

(YEARLY)

INSPECTION

MAST ASSEMBLY

1

Mast Sections

2, 5

Chain Systems

14

3, 14

14, 25

Sequence Cable Systems

3

1, 2, 3

Support Bars

1, 2

Covers or Shields

1

Sheave Systems

1, 2

1, 2

Bearings

1, 2

Slide Pads

1, 2

PLATFORM ASSEMBLY

1

Platform

1

1

Guard Rails

1, 2

2

Gate

1, 5

5

Floor

2

Extension Deck Assembly

1, 5

Lanyard Anchorage Point

1

CHASSIS ASSEMBLY

1

Outrigger Beams, Sockets, and Locking Pins

1, 2, 5, 7

1, 2, 5, 7

Outrigger Screw Jacks

5

1, 2, 5

Tires/Wheels/Caster Systems

1, 2

1, 2

Bubble Level

1, 2, 7

1, 2, 7

Cable Reel (LiftMaster Only)

5

5

Winch and Winch Brake (LiftMaster Only)

1, 2, 5

FUNCTIONS/CONTROLS

1

Platform Controls

5

5, 6, 7

Ground Controls

5

5, 6, 24

Function Control Locks, Guards, or Detents

5

5

Function Enable System

5

Emergency Stop Switches (Ground & Platform)

5

5

Function Limit or Cutout Switch Systems
Manual Descent or Auxiliary Power

5

5

POWER SYSTEM

Batteries

19

9

Battery Fluid

11

11

Battery Charger

5

HYDRAULIC/ELECTRIC SYSTEM

1

Hydraulic Pump

9

1, 2, 9

2, 5

Hydraulic Pump Cover

1

Hydraulic Cylinder

7, 9

2, 9

2, 9

Cylinder Attachment Pins and Pin Retainers

1, 2

Hydraulic Hoses, Lines, and Fittings

9

1, 9

Hydraulic Reservoir, Cap, and Breather

5, 7

5, 7

5, 7

Hydraulic Filter

Advertising