SECTION 2 - SERVICE PROCEDURES

3120782

– JLG Lift –

2-27

shim stock and slide pad to mast section rail with
shim stock against rail and slide pad with bev-
eled side out)
.

PRIOR TO C# 142920 THE EL MAST INSTALLED TWO SHORT
SLIDE PADS ON EACH SIDE OF THE PLATFORM MOUNTING
MAST SECTION. AS OF C# 142920 A LONGER SINGLE PAD IS
INSTALLED ON EACH SIDE.
ON MACHINES PRIOR TO C# 142920 THE 41EL MOUNTS THE
(SHORT) UPPER SLIDE PAD IN THE UPPER SET OF SLIDE PAD
MOUNTING HOLES. THE 20EL, 25EL, 30EL AND 36EL MACHINES
MOUNT THE UPPER SLIDE PAD IN THE LOWER SET OF SLIDE
PAD MOUNTING HOLES. (SEE FIGURE 2-5.)

d. Carefully thread the slide pad mounting bolts

with flatwashers through slide pads and shim
stock into threads in mast section-5/-6/-7. Be
certain there are no air gaps between shims,
shim and mast or shim and slide pad when tight-
ened.

NOTE: Mast section-5/-6/-7 into section-4/-5/-6 fit should be

very snug but still be able to be pushed together by
hand. If too tight, remove section-5/-6/-7, disassem-
ble slide pad and reduce thickness of shim stock.

e. Begin sliding top of mast section-5/-6/-7 with

closed rail down engaging the slide pads into
slide pad channels at bottom of mast section-4/-
5/-6’s open rail. Continue to push section-5/-6/-7
into section-4/-5/-6 until BOTTOM ends of mast
sections are even.

f. Check mast section for side play. If play exists

use thicker shims dividing thickness equally
between both sides of mast.

g. When mast slide pads are shimmed properly,

there should be no side to side movement of
slide pad in rail channel. Mast sections should
be very snug in channels but still be able to slide
in channel by hand.

73.

Slide mast section-5/-6/-7 to top of section-4/-5/-6.

74.

Insert threaded ends of cable assembly (attached to
top of mast section-3/-4/-5)
through the cable anchor
plate located on bottom of extended mast section-5/
-6/-7. Loosely thread two (2) 3/8"-16UNC nuts onto
stud threads on each chain. Chains will be adjusted
later in assembly.

75.

Slide mast section-5/-6/-7 back into mast section-4/-
5/-6 until bottom ends of masts are even. Check to
make sure cable set attached to top of section-3/-4/-
5 is seating properly in cable sheave wheels
attached to top of mast section-4/-5/-6. (Mast sec-
tions-2, -3, -4 and -5 may need to be restrained to
keep their slide pads from pushing out the bottom of
mast sections-1, -2, -3, -4 and -5)
.

76.

Adjust top and bottom ends of mast sections so they
are all even with each other. At bottom of mast
assembly, thread all chain/cable adjusting nuts on
threaded ends until they are snug against the
anchor plates and all slack is removed from chains
and cables. Check that chains and cables are
seated in their sheave wheels at top of mast assem-
bly.

77.

Assemble the latch bar to mast section-5/-6/-7, the
mini covers to the top of each mast section and the
sequencing cables and hardware to the side of the
mast assembly.

Mast assembly should now be complete.