Section 2 - pre-operation and inspection, 1 pre-operation check and inspection, 1 pre-operation check and inspection -1 – JLG 4017PS Platforms Operator Manual User Manual

Page 21: Warning

Advertising
background image

Section 2 - Pre-Operation and Inspection

2-1

31200345

SECTION 2 - PRE-OPERATION AND INSPECTION

2.1

PRE-OPERATION CHECK AND INSPECTION

Note: Complete all required maintenance before operating unit.

Note: Pre-operation check and inspection of the telehandler is to be completed first.
Refer to the Operation & Safety Manual supplied with telehandler.

The platform pre-operation check and inspection, performed at beginning of each
work shift or at each change of operator, should include the following:

1. Cleanliness - Check all surfaces for leakage (oil) or foreign objects. Report any

leakage to the proper maintenance personnel.

2. Structure - Inspect the platform structure for dents, damage, weld or parent

metal cracks or other discrepancies.

3. Safety Decals - Ensure all safety decals are legible and in place. Clean or

replace as required. See page 2-3 for details.

4. Operation and Safety Manuals - Operation & Safety Manual located in manual

holder.

5. Walk-Around Inspection - See page 2-6 for details.

WARNING

FALL HAZARD. Use extreme caution when checking items beyond your normal
reach. Use an approved ladder.

OAH1000

PARENT METAL CRACK

WELD CRACK

Advertising