3 walk-around inspection, 3 walk-around inspection -6 – JLG 4017PS Platforms Operator Manual User Manual

Page 26

Advertising
background image

Section 2 - Pre-Operation and Inspection

2-6

31200345

2.3

WALK-AROUND INSPECTION

Begin your walk-around inspection at item 1, as noted below. Continue to your right
(counterclockwise when viewed from top) checking each item in sequence.

INSPECTION NOTE: On all components, make sure there are no loose or missing
parts, that they are securely fastened and no visible leaks or excessive wear exists
in addition to any other criteria mentioned. Inspect all structural members including
railing for cracks, excessive corrosion and other damage.

1. Platform -

• Properly installed, see “Platform Installation” on page 5-3.

• Rail Connections properly secure, undamaged and no missing hardware.

2. Rotate Coupler - Undamaged, bolts tight; hydraulic hoses undamaged, not

leaking.

3. Platform Recognition Sensor Plate (AUS): See inspection note.

4. Cables and Hoses - Clean, undamaged, correctly connected and not kinked or

twisted.

5. Platform Gates - Clean, undamaged and closes properly.

6. Control Console - Clean, undamaged; controls return to normal and control

markings are legible.

OZ2671

2

5

6

1

4

3

Advertising