Section 4 - operation, 1 preparing machine for platform operation, 1 preparing machine for platform operation -1 – JLG 4017PS Platforms Operator Manual User Manual

Page 37

Advertising
background image

Section 4 - Operation

4-1

31200345

SECTION 4 - OPERATION

4.1

PREPARING MACHINE FOR PLATFORM OPERATION

The following must be completed from the cab to transfer power to the platform.

1. Verify platform is properly installed and quick attach lock pin is fully engaged.

See “Platform Installation” on page 5-3. Platform (1) will be shown on display.

2. Apply park brake.

3. Shift transmission control lever to neutral.

4. Fully retract boom and lower boom below 10 degrees.

5. Fully lower outriggers, lifting front tires and ensure machine is level. Display

indicates when outrigger (2) and level (3) requirements are satisfied.

6. Shut off engine and rotate key to Platform position. Display indicates machine is

in platform mode (4).

7. Remove key and verify the power/emergency stop switch is pulled up.

8. Exit cab and lock cab door.

OZ3041

1

0000

0000

00

N1

RPM

OZ3051

3

2

0000

0000

00

N1

RPM

OZ3061

0000

0000

00

N1

RPM

4

Advertising