JLG 41AM (3120872) Service Manual User Manual

Page 41

Advertising
background image

SECTION 2 - SERVICE PROCEDURES

3120872

– JLG Lift –

2-19

tom of the mast section-1. Shim to eliminate any
side clearance to prevent any strain on the sides of
the mast when the bolts are tightened.

7. New Design Cylinder Mount: Install the cylinder

mounting plates at the bottom of the mast section-1.
Mount plates two each side, using the the (2) two
long pass through bolts and nuts, apply Loctite
#242 to the bolt threads before tightening nuts.

8. Original Design Cylinder: Clamp the cylinder in the

mounting journal of the cylinder mount. Apply Loc-
tite #242 to the journal bolt threads and torque to 85
ft. lbs. Align the hole in the mounting journal with the
hole in the cylinder and Install the (1) 5/16" bolt.

New Design Cylinder: Install the mounting pin
through the side mounting brackets and the cylinder
valve body and through the mounting brackets on
the other side of the mast. Install the snap rings to
each end of the mounting pin.

9. Connect the hydraulic fittings and lines, (new fittings

should be used).

10. Slide the mast together (stowed position) from the

top of the mast.

11. Stand machine upright on it’s base wheels.

12. Connect the hydraulic line fittings at the pump.

13. Check oil level in the hydraulic oil reservoir, add oil

to fill line, if necessary.

14. Install the ground station (pump) cover.

15. Set-up machine for operation and cycle mast (up

and down) approximately 3 ft. to 4 ft. a few times.

16. Check the hydraulic oil reservoir again, add oil to the

fill line.

Figure 2-1. Lift Cylinder Internal Component Assembly Cross-Section.

PISTON

LOCKNUT

(Torque

175-200 Ft. Lb.)

WEAR

RING

PISTON

SEAL

O-RING

O-RING

BACKUP

RING

CYLINDER

HEAD

RETAINING

RING

RETAINING RING

GROOVE

ROD

SEAL

ROD

WIPER

CYLINDER

HEAD

WHEN ASSEMBLING

CYLINDER

APPLY ANTI-SEIZE

COMPOUND

AROUND THE HEAD

IN THIS AREA ONLY

CYLINDER

TUBE

ASSEMBLY

CYLINDER

ROD

Advertising