PTO CHIPPERS

9

ENGLISH

ASSEMBLY

2.7 ConneCT ConTrol BoX wIres To

TraCTor

There are two electrical wires (red and white) that come

wrapped around the three-point PTO connector.
• connect the red wire to a 12-volt power source, such

as the alternator or the battery.

• Ground the white wire (connect to negative post on

the battery or another point).

The driveline supplied with this machine may need to be

cut to a shorter length for proper operation with the tractor

being used. To determine if driveline will need to be cut,

follow steps below or consult attached driveline manual.
1. BeFore aTTaCHInG THe DrIVelIne: attach the

machine to the tractor with three-point hitch system.

2. Raise and lower machine on three-point hitch to determine

the shortest possible working distance between the tractor

PTO shaft and the drive shaft of the machine.

3. Pull the driveline apart so the two pieces are separated.

connect the piece with 6-splined connector to tractor

and the other piece to the machine.

4. Position installed driveline halves parallel to one another.

(Photo below is example of driveline overlap.)

ImPorTanT

The tractor must have a

standard 540 rPm PTo shaft.

• If the tractor has an electric PTO clutch, consult your dealer

for correct operating procedures.

consult the attached GKN Walterscheid driveline manual for

complete service and maintenance recommendations.

5. On larger outer tube, measure back 1-1/4" (32mm)

from lower yoke shield and mark plastic tube. Repeat

this process for smaller inner plastic tube measuring

1-1/4" (32mm) back from upper yoke shield.

6. Remove driveline pieces (for ease of cutting) and cut

ONlY the outer and inner plastic tubes.

2.6 ConneCT To PTo DrIVelIne

9. File both shaft ends to remove sharp edges and slide

the driveline pieces back together.

10. When you have confirmed that the driveline is the

correct length for your tractor, connect the driveline

to the chipper rotor shaft using key stock and two set

screws in the owner’s kit.

11. connect the opposite end of the PTO shaft to the

tractor.

7. After cutting plastic tubes, measure 1-9/16" (40mm)

from the ends of both newly cut plastic tubes.

8. Mark the inner steel shafts and cut both shafts at 1-9/16"

(40mm) as shown in photos below.

1-1/4" From sHIelD

Yoke

sHIelD

ouTer

TuBe

1-9/16" (40mm)

ouTer

TuBe

sTeel

sHaFT

sTeel

sHaFT

Inner

TuBe

1-1/4" From sHIelD

Inner

TuBe

Yoke

sHIelD