Assembly, Gt-225 assembly, Plastic shield installaion – Echo GT-225 User Manual

Page 13: Nylon line head installation

Advertising
background image

GT-225

ASSEMBLY

X7722271207

13

© 03/2013 ECHO Inc.

ASSEMBLY

Plastic Shield Installaion

Cut-off knife on debris shield has sharp edges. Avoid contact when installing or removing line head.

Wear Gloves or personal injury may result:

Cutoff knife is sharp.

Gearcase and surrounding area may be hot.

1. Remove wing nut (A), washer (B), and bolt (C).

2. Snap the shield over the bearing housing.

3. Install bolt (C), washer (B), and wing nut (A).

Nylon Line Head Installation

1. Remove plastic threaded shaft sleeve from threaded PTO

shaft.

2. Align locating hole in upper plate with hole in bearing

housing and insert locking tool (A).

3. Place large washer (B) then line head (C) on threaded shaft,

followed by small metal washer (D) and locknut (E).

4. Install locknut. Turn locknut clockwise, and tighten securely.

Remember to remove the locking tool.

Parts Required:

Rapid LoaderTM Head, Large washer,
Small washer, 3/8-24 Locknut, (2) Pre-cut
Nylon Line 8 in. x .080 in., Plastic Shield
Assemblys.

A

B

C

A

B

C

E

D

Advertising