Quick start guide mounting rap/rac1000 series – ADS-TEC RAP/RAC1000 Quick Start Guide User Manual

Page 2

Advertising
background image

 

Quick Start Guide Mounting RAP/RAC1000 series

 

2

110513_

Q

UICK

S

TART

GUIDE

RAP_RAC1000_EN_DZ-HAND-91015-1

V1.3

© ads-tec GmbH • Raiffeisenstr.14 • 70771 Leinfelden-Echterdingen

 

1. Fixing the installation bracket

2. Connecting the supply cables

3. Routing cables through grommets

5. Drill template (1:1)

1.1. Bracket installation

The installation bracket is fixed to the device in the state
of delivery.

a) Loosen the Allen screws (M4x12) in order to fix the

device at the selected position. (1)

b) Fix the installation bracket excluding the device at

position you have selected. Make sure that the
installation bracket is securely fixed with a minimum
of two screws on opposite ends.

c) Attach the device to the fixed installation bracket and

ensure that device and installation bracket is flush.


Fix the device on the installation bracket by using both
Allen screws previously removed. (1)

2.1. Opening the service slot cover

The service slot must be opened in order to install the
cables. Remove the five screws indicated by arrows
(M3x8).

2.2. Power supply connection

The power for this device can be supplied by a 24V DC (2
pin plug), or as an option, via a 230V AC (3 pin plug) or by
a PoE connector.

24 V DC power supply

PIN NUMBER

SIGNAL NAME

1

24V DC

2

N

110/230V AC power supply

PIN NUMBER

SIGNAL NAME

1

L

2

PE

3

N

PoE (Power over Ethernet)

PIN

NUMBER

SIGNAL

NAME

1

TX +

2

TX -

3

RX +

4

PoE/G

5

PoE/G

6

RX -

7

PoE/-48V

8

PoE/-48V

The PWR LED will continuously light green as soon as the
power supply is connected with the device.
For initial commissioning it is essential to establish a
connection between this device and a PC by using a RJ45
network cable.

To connect this device with a PC: Device host connector <-
> PC LAN connector

3.1. Cable installation

Existing grommets are used for cable protection and in
order to ensure compliance with the IP65 protection
class.
Insert the connected cables into the grommets so that
the grommets fully enclose the cables.

Select the grommet size in accordance with the
corresponding cable diameter.
Then put the cable, including the grommet, in the recess
provided for it.

3.2. Closing the service slot

Make sure that all grommets are properly seated in the
recesses provided for them.
Now close the service slot and fix it using the previously
removed screws (M3x8).




4.1. Antennae installation

Two antennas should be installed for operating a WLAN
module.

The device is capable of operating two modules for
different WLAN networks in parallel mode.
The correct antenna installation for one module includes
one horizontally aligned and one vertically aligned
antenna.
The four or eight antennas supplied with the device work
in the 2.4GHz or in the 5GHz frequency range (two or four
each).
Install the antennas at the device.

 

4. Montage der Antennen

Advertising