Bryant SINGLE PACKAGE ROOFTOP ELECTRIC COOLING/GAS HEATING UNITS 581A User Manual

Page 40

Advertising
background image

Copyright 1999 Bryant Heating & Cooling Systems

CL-1

CATALOG NO. 5358-101

CUT

AL

ONG DO

T

T

E

D L

INE

CUT

AL

ONG

DO

T

T

ED L

INE

START-UP CHECKLIST

I. PRE-START-UP

 VERIFY THAT ALL PACKING MATERIALS HAVE BEEN REMOVED FROM UNIT
 VERIFY INSTALLATION OF INDOOR FAN MOTOR ADJUSTMENT BOLT (155) OR ADJUSTMENT BOLT AND PLATE

(180, 240 ONLY)

 OPEN LIQUID LINE SERVICE VALVE
 VERIFY INSTALLATION OF ECONOMIZER HOOD
 VERIFY INSTALLATION OF EXHAUST HOOD
 VERIFY THAT CONDENSATE CONNECTION IS INSTALLED PER INSTRUCTIONS
 VERIFY THAT ALL ELECTRICAL CONNECTIONS AND TERMINALS ARE TIGHT
 VERIFY GAS PRESSURE TO UNIT GAS VALVE IS WITHIN SPECIFIED RANGE
 CHECK GAS PIPING FOR LEAKS
 CHECK THAT INDOOR-AIR FILTER IS CLEAN AND IN PLACE
 CHECK THAT OUTDOOR AIR INLET SCREEN IS IN PLACE
 VERIFY THAT UNIT IS LEVEL
 CHECK FAN WHEEL AND PROPELLER FOR LOCATION IN HOUSING/ORIFICE, AND VERIFY SETSCREWIS TIGHT
 VERIFY THAT FAN SHEAVES ARE ALIGNED AND BELTS ARE PROPERLY TENSIONED
 VERIFY THAT SCROLL COMPRESSOR IS ROTATING IN THE CORRECT DIRECTION
 VERIFY THAT CRANKCASE HEATER HAS BEEN ENERGIZED 24 HOURS BEFORE START-UP

II. START-UP

ELECTRICAL

SUPPLY VOLTAGE

L1-L2

L2-L3

L3-L1

COMPRESSOR AMPS — COMPRESSOR NO. 1

L1

L2

L3

— COMPRESSOR NO. 2

L1

L2

L3

SUPPLY FAN AMPS

EXHAUST FAN AMPS

TEMPERATURES

OUTDOOR-AIR TEMPERATURE

F DB (Dry Bulb)

RETURN-AIR TEMPERATURE

F DB

F WB (Wet Bulb)

COOLING SUPPLY AIR

F

GAS HEAT SUPPLY AIR

F

PRESSURES

GAS INLET PRESSURE

IN. WG

GAS MANIFOLD PRESSURE

STAGE NO. 1

IN. WG

STAGE NO. 2

IN. WG

REFRIGERANT SUCTION

CIRCUIT NO. 1

PSIG

CIRCUIT NO. 2

PSIG

REFRIGERANT DISCHARGE

CIRCUIT NO. 1

PSIG

CIRCUIT NO. 2

PSIG

 VERIFY REFRIGERANT CHARGE USING CHARGING CHART ON PAGE 29.

GENERAL

 ECONOMIZER MINIMUM VENT AND CHANGEOVER SETTINGS TO JOB REQUIREMENTS

MODEL NO.:

SERIAL NO.:

DATE:

TECHNICIAN:

Advertising