Chapter 4. maintenance, 1 general caution during maintenance, 2 check list and periodic maintenance – AMMCO AC1000M Motorcycle Lift User Manual
Page 17: 1 general caution during maintenance -17, 2 check list and periodic maintenance -17, Maintenance interval chart, Chapter 4, Maintenance

Model: AC1000M
Installation, Operation & Maintenance
17
CHAPTER 4.
MAINTENANCE
4-1 General caution during
maintenance
1) Two or more persons should perform
maintenance.
2) Maintenance should be carried out after
putting a signboard of "NO ENTRANCE"
at work area.
3) Do not disassemble the system before
you are familiar with the disassembling
sequence.
4) Record the place or parts where
maintenance is needed.
5) Keep disassembled parts stored where
they can be easily accessed.
6) Be sure to fasten bolts and nuts position
correctly during assembly.
7) During maintenance, verify locks are in
“engaged” position.
8) Inspect air lines and fittings at least once
a month.
9) Check weekly for loose nuts and bolts.
Retighten if needed.
4-2 Check List and periodic maintenance
Maintenance Interval Chart
The following chart should be considered strictly as a guide to general maintenance intervals. Depending
on operating conditions, the intervals of maintenance should be changed.
Initial Thereafter
Every Part#
10 hours
25 hours
50 hours
100 hours 200 hours
Maintenance
Interval
Item
1 month
3 months
6 months
12
months
24
months
Bolts Inspect
X X
603
Pivot Pin
Inspect
X
X
13, 14, 20
Pivot Pin
Circlip
Inspect,
Replace
X X
608,
609
Lubrication
Points
Lubricate X X X X
Drop
Panels
Inspect
X X 2
Sliding Lock
Inspect
X
X
12
Rollers
Inspect
X X X
16,
17
Cylinder
Inspect
X X X 7
Cylinder Seal
Visually
Inspect
X X X
Bearings
Inspect
X X X
612
Safety Lock
Guide
Inspect
X X X X 18
Locking
Bar
Inspect
X X X X 6
Pedal Inspect
X X X X 22
Air Valve
Inspect
X
X
X
X
23