5.1.6 Lift the roof cover to the height of the leading-in conductor and feed
the right and left keder of the cover through the leading-in conductor
into the keder groove of the roof beam, through pulling of the
traction cables of the opposite tent’s side (pic. 19).
5.1.7 Pull the two of the traction wires at the same time the roof cover into
the roof
beam. Pull the cover slowly over the ridge.
5.1.8 After the setting of the cover into the roof beam, the traction wires
will be removed and hang up to the 3. traction wire, which has been
pulled in with the cover over the ridge. The traction wire will be
stretched back in a way that both of the other traction wires can be
placed again to the start position.
5.1.9 Repeat the points 5.1.1 until 5.1.8 for all the roof covers.