Installation instructions, Danger, Warning – Autoquip TORKLIFT User Manual

Page 21

Advertising
background image

21


5. Make temporary electrical connections and permanent hydraulic connections.

Raise the lift approximately one foot using the “UP” button. Then lower the lift
back to fully collapse, holding the “DOWN” button for approximately 60 seconds.
Repeat this process five to seven times to bleed any air out of the hydraulic
system.


6. Raise and lower the lift to make positioning adjustments and align the platform in

the pit with a proper clearance of ¾” minimum around the edges from the
platform to the pit angle.

DANGER

!

Do not work under lift without Maintenance Device! To avoid
personal injury, NEVER go under the lift platform until the load
is removed and the scissors mechanism is securely blocked in
the open position and the appropriate OSHA lock-out/tag-out
procedure is followed. See "Lift Blocking Instructions" section.

7. The base frame of the lift has pre-drilled holes for lagging it securely to the floor.

Mark hoes, drill, and install with anchors. Lifts with oversize platforms have
minimum pull out requirements of 2,000 lbs. for each anchor.

8. Make the permanent electrical connections and operate the lift through a few

cycles.

CLEAN UP

1. Clean up any debris from the area. A clean installation makes a good impression

and creates a much safer environment!


2. Touch-up paint is available from Autoquip for repair of damaged paint surfaces.

WARNING!


All DANGER, WARNING, and CAUTION labels and informational
decals and plates must be intact and in place on the lift. Contact
an Autoquip representative if labels are missing or damaged.
See “Label Identification” section of this manual.

3. Clean up any spilled oil from the area. Dispose of and handle used fluid as a

hazardous material.


4. Train key personnel on the operation of the lift and all safety features and

procedures.

INSTALLATION INSTRUCTIONS

Advertising