Installation instructions, Figure 11 cable threading diagram – Autoquip VERTICAL RAM LIFTS - DUAL RAM User Manual
Page 25
Advertising

25
OPEN SOCKET
FOR CABLE A
SHEAVES
EXTRA HEAVY
OIL LINE COUPLING
RAM DUAL
OPEN SOCKET
FOR CABLE B
PIT CHANNEL
EQUALIZER STRUT
STRUT TUBE
CABLE B
CABLE A
CABLE A
CABLE B
CABLE A
CABLE B
CABLE B
THIMBLE
EYE BOLT
THIMBLE
CABLE CLIPS
CABLE A
(TYP)
RAM
CL
TO
CL
Figure 11 Cable Threading Diagram
INSTALLATION INSTRUCTIONS
Advertising
This manual is related to the following products: