Englert IMP Englert Combined User Manual
Page 7
Advertising

SUBJECT TO CHANGE WITHOUT NOTICE
6
G
ENERAL
I
NSTALLATION
S
EQUENCE
1. Install and caulk the appropriate flashing/trims.
2. Measure and cut the first panel
3. Place and plumb the first panel
4. Through-fasten the cut edge.
5. Install clips and fasteners along the factory edge of the panel at the girt locations.
6. Apply sealant pigtails.
7. Field-caulk the second panel.
8. Place and engage the second panel.
9. Install clips and fasteners along the factory edge of the panel at the girt locations.
10. Continue
Advertising