Unison battery pack option kit – ETC Unison BatteryPack Option Kit User Manual
Page 4

E T C S e t u p G u i d e
Unison Battery Pack Option Kit
Unison Battery Pack Option Kit Setup Guide
Page 4 of 4
Electronic Theatre Controls, Inc.
Step 3:
Secure the wiring harness and twisted pairs to the host enclosure using the supplied
cable tie. A loose or poorly routed wiring harness could interfere with option module (ERn-
NET or ERn-RPS) or option board (DRd-FLO or DRd-DALI) installation.
Step 4:
Install the battery pack on to the bottom of the enclosure.
a: Insert the tabs from the battery pack into the enclosure slots.
b: Secure the battery pack to the enclosure using the captured screw provided.
N o t e :
As the battery is mated to the rack, the connector on the battery pack and the
connector receptacle installed in step 1 also mate.
see note after step 4a instructions
Step 4a:
Step 4b: