Right i/o card upgrade – ETC Unison DRd Right IO Card Upgrade Kit User Manual

Page 4

Advertising
background image

E T C I n s t a l l a t i o n G u i d e

Right I/O Card Upgrade

Right I/O Card Upgrade Kit Installation

Page 4 of 4

Electronic Theatre Controls, Inc.

Step 6:

Replace the dimmer modules, Station Power Module and Architectural Control Processor
into the slots they were previously removed.

Step 7:

Slide the module retention bar to the right and tighten the screws to secure it in place.

Step 8:

Supply power to the DRd enclosure.

Step 9:

Unless structural changes are being made to the existing system, no dimming or
architectural re-configuration should be necessary. If the system is being modified,
reference the related Architectural Control Processor Configuration and Programming
Guide for configuration setup and operation information.

W A R N I N G :

Never power up or operate the Unison DRd enclosure without all modules

installed. Failure to comply exposes you to dangerously high voltages that may

result in death by electrical shock.

Advertising