3 parallel control of the guard locking, 4 operation on safety relay, Parallel control of the guard locking – EUCHNER MGB (V1.2.3) User Manual
Page 5: Operation on safety relay
Advertising

MGB Help for Setup and Service
1.3 Parallel control of the guard locking
The guard locking solenoids are supplied from voltage U
A
. The inputs U
CM
serve to control the solenoids; the
current draw here is only approx. 3 mA. Several U
CM
inputs can be controlled in parallel if a common 0 V
potential is present at OV
M
.
1.4 Operation on safety relay
The MGB can be connected to most conventional safety relays. Since the outputs, similar to those on a so-
called OSSD on light barriers or light curtains, produce clock pulses, a connection as described for non-contact
systems must be used.