Maintenance, Innovative fluid power, 3 assembly – HYDAC SB 600 User Manual

Page 4

Advertising
background image

INNOVATIVE FLUID POWER

26

PN#02073469 / 07.14 / ACU1102-1326

Maintenance

3.3 Assembly:

The interior of the shell must be absolutely free of any contamination or

debris prior to assembly.
Prepare bladder for installation by removing

valve seal cap

(item 5)

, and

gas valve core

(item 3)

. Press all residual air out of bladder.

G Lubricate interior of shell and exterior of bladder with appropriate filtered fluid, using a

fluid volume of approximately 10% of total accumulator volume.

(Do not use water, it is not a lubricant)

.

Different bladder compounds require different lubricants.

H Place bladder stem lock nut

(item 4)

over the pull rod with the male threads facing

the pull rod handle. Insert bladder pull rod through shell

(threaded connection toward fluid side opening)

.

Thread pull rod onto gas valve. Fold bladder in half lengthwise, then again if necessary.

Pull the pull rod until gas valve emerges through gas port opening. Make sure bladder

is stretched and not twisted when being inserted. Once gas valve is through opening,

loosely attach

bladder stem lock nut

(item 4)

to prevent bladder from slipping back into

shell. Remove pull rod from gas valve.

Insert

gas valve core

(item 3)

and torque to 0.5 Nm (0.4 lb-ft).

I To prevent damage to the threads and O-ring, tape fluid port threads before assembly.

Insert fluid port into shell. Make sure bladder is fully extended within the shell.

J

Fold

anti-extrusion ring

(item 14)

in half and insert into shell with steel seat facing fluid

side opening. To do this, push fluid port further into shell and then pull it back through the

middle of the anti-extrusion ring.

K Slightly pull on the fluid port to position it. Do not allow fluid port to fall back into shell.

This can be accomplished by either pulling on the fluid port while inserting seals or

precharging the bladder with 10 to 15 psi of dry nitrogen to keep fluid port in position

(refer to HYDAC Charging and Gauging brochure #02068202)

.

L Order of Assembly:

flat ring

item 15

O-Ring

item 16

back-up ring

(where applicable)

item 23

spacer ring

item 17

fluid port lock nut

item 18

G

L

I

K

H

J

Advertising
This manual is related to the following products: