JULABO F1000 Recirculating Cooler User Manual
Page 17
Advertising

F250, F500, F1000
1.951.4806-V1
17
F250
• Before operating the unit after transport, wait about
one hour after installation.
This will allow any oil that has accumulated laterally
during transport to flow back down, thus ensuring
that the compressor can develop its maximum
capacity.
• Remove cap screws from the connections.
• Connect the tubing from the external system to the
pump connectors and check for leaks.
F500, F1000
• If required, connect a hose to the overflow
and
drain into a suitable container, which must be
positioned deeper than the initial "overflow".
• Do not seal the overflow!
Advertising
This manual is related to the following products: