Goop application, Step 2 step 1, Qm l – Kargo Master PRO II – Van Cargo Rack (40880) User Manual
Page 4

GOOP APPLICATION
Apply a healthy air tight bead of goop
around
every swaged joint as shown, to
prevent moisture from leaking into and out
of the joint. If this is not done properly, the
inside surface of the tubes can rust and
rusty water can leak out. Maintain this
joint seal throughout the life of your rack.
Swaged joint & holes
Smooth goop at swaged joint & holes
GOOP
GOOP
#
3
=
BOLT TOGETHER TOP (small tube) & SIDE RAIL (large tube),
as shown, using bolt
G
& nut
I
.
The allen wrench is included in the package.
#
1
= Slide FRONT SIDE BEAMS into front "U" CROSS BAR
A
03
05
#
2
= Slide REAR SIDE BEAMS into rear "U" CROSS BAR
B
04
06
V- Series 11_1.1
STEP 2
STEP 1
Q
M
L
GO
OP
G
I
A
03
GOO
P
#1 = Cover entire swedge joints with GOOP and
join FRONT and REAR side channels together.
Be sure the connecting plates overlap and bolt
together with bolts Q, washers L and lock nuts M.