Commissioning
3.4
Commissioning with the »Engineer«
38
Lenze · 8400 BaseLine C · Reference manual · DMS 1.6 EN · 01/2014 · TD05
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Diagnostics options
When the »Engineer« is used, trouble during commissioning can be detected and eliminated conve-
niently. Proceed as follows:
• Check whether error messages appear in the »Engineer«.
• You can find a description of each possible message in the chapter entitled "
• Check the input terminals for their corresponding setpoints.
• The Terminal assignment tab displays the current input/output signals.
• Check the signal flow of the application.
• To do this, open the Application Parameters tab and click on the Signal flow button. The sig-
nal flow which is then shown enables a view of the setpoints being applied and their proces-
sing.