Mayline E-Series User Manual
Page 4

(4)
WORK SURFACE INSTALLATION PROCEDURE
Assembled
Power Base
Screws Provided
with Control
Screw (E9)
FRONT
FRONT
NOTE:
#10 X 3/4" Screws (E9) are provided for clamp
installation only.
#10 x 1" Screws (E10) are provided for Work
Surface attachment only.
1. Place work surface face down, onto a protected
surface.
2. Invert the Power Base so the Top Plate is down.
Position the front of the Power Base toward the front
of the work surface. Secure the Base using six #10
x 1" Screws (E10).
3. Place Hand control in desired location along front
edge. Attach using screws provided with the control.
4. Various size clamps are provided to secure
excess cable to the work surface. Position Clamps
(E6 - E7 - E8) as needed and secure with #10 X 3/4"
Screws (E9).
5. Turn the completed unit to an upright postion.
Clamp (E6)
Screw (E10)
ATTENTION:
MAYLINE includes screws for the installation of a Work
Surface with a minimal thickness of 1 inch (25.4mm).