Connect multibox hardware (dual processors), Sk 2, Make multibox connections 304 – MTS FlexTest Models 200 User Manual

Page 304: Task 2 make multibox connections, Box 1, Box 2, Box 3

Advertising
background image

MTS FlexTest® Models 40/60/100/200 Controller Hardware

Aero Multibox Overview

Aero Multibox Systems

304

Task 2

Make Multibox Connections

Once the hardware is installed and configured, you can make the box-to-box
connections and set up the various networks used in the multibox system.

Connect Multibox Hardware (dual processors)

1. Connect the Fiber-Optic cables as show below.

2. Connect the Box In/Box Out cables as shown below.

3. Install a Box Out jumper plug on the last box.

Note

Dual processor configurations require the installation of VMIC memory
modules on each processor board.

B

O

X

A

D

R

S

J8 Intlk In

J9 Intlk Out

J51 Box In

J52 Box Out

B

O

X

A

D

R

S

J8 Intlk In

J9 Intlk Out

J51 Box In

J52 Box Out

B

O

X

A

D

R

S

J8 Intlk In

J9 Intlk Out

J51 Box In

J52 Box Out

Box 1

(Master

)

Box Out Jumper Plug

(required on last box)

Box 2

(Dependent)

Box 3

(Dependent)

Box

Address

Switch = 0

148.150.203.8

RX

TX

RX

TX

RX

TX

Box

In

Box

Out

Box

Out

Box

In

Box

Address

Switch = 1

148.150.203.16

Box

Address

Switch = 2

148.150.203.24

49x.43

CPU 1

49x.43

CPU 1

49x.43

CPU 1

Box In/Box Out Cable

Fiber Optic Cable

Advertising