Installation of the direct shear hardware, Installation of the direct shear hardware 29 – MTS 316 Load Frame User Manual

Page 29

Advertising
background image

Direct Shear Configuration

Series 316 Load Frame Product Information

Operation

29

Installation of the Direct Shear hardware

Note

The upper and lower portions of the direct shear specimen box may be
attached with handles. Do not remove the handles until the direct shear
system is installed in the test space and the upper portion of the fixture is
attached to the actuator rod.

1. Remove the locating pin on the direct shear hardware and push the assembly

into test space.

2. Insert the locating pin into the forward locating hole.

3. Close the load frame front door.

4. With the axial actuator in stroke control, turn the HSM on.

5. Position the axial actuator to allow connection of the axial load cell used

with the direct shear configuration.

6. If attached, remove handles supporting the upper portion of the direct shear

assembly.

Advertising