Customer Responsibilities

It is the customer's responsibility to have the facility ready to install the system and move the system to its
final testing location. It is also the customer's responsibility to have the proper insurance to ensure safe
transport of the system. Facility preparation includes:

Provide electrical power available for the frame, controller, and peripherals where the system will be
located. This includes the requisite supplementary ground connection.

Provide filtered dry air pressure for pneumatic components and water for component cooling, where the
system will be located, if applicable.

Ensure a clear path from the receiving dock to the space where the system will be located.

Provide a suitable, flat, level and sturdy surface on which to place the load frame.

Have proper lifting and moving equipment such as a forklift and overhead crane available.

When the Field Service Engineer arrives for installation, have necessary support people available such
as:

Lab managers and operators for initial training

Information technology personnel for networking support

Moving the system to its final testing location. This includes:

Get the system off the delivery truck and onto the receiving dock.

Uncrate the frame and the (optional) table.

Install the lifting hoist rings into the lift points.

Move the frame, (optional) table, and remaining boxes to the frame's final testing location.

Mount the frame to a suitably robust table.

When all of the above have been satisfied, call MTS and arrange installation.

The following subsections provide detailed information on facility preparation, moving the system, and
insurance.

MTS Responsibilities

Note:Before you call MTS to arrange an installation appointment, you should have completed all the
items listed for customer responsibilities. That is, the frame should be on the support table at the final
testing location. All the boxes and components that accompanied the system are located near the
frame. All necessary electrical power, pressurized air, and cooling water are available. Personnel who
should be trained and networking support will be available at the time of installation.

MTS’ standard contract requires MTS to provide the necessary services to ensure that your test system
operates accurately. These services include:

Connect cables.

Install test area enclosure (if purchased.)

12 MTS Acumen™ Electrodynamic Test System

Responsibilities