Roller screed assembly – Multiquip WRS5200 (ORIGINAL COPY) User Manual

Page 41

Advertising
background image

wrs5200 hydraulic roller screed • operaTion manual — rev. #1 (10/22/10) — page 41

rOller ScreeD aSSeMblY

Task 9: hydraulic hoses

There are four hydraulic hoses that need to be routed from

the stack and speed control valves at the operator's end of

the screed to the drive tube motors (power unit end) and

power unit.
Route the hydraulic hoses as shown in Figure 47.

Figure 26. Hydraulic Hose Routing

Advertising