Daily pre-operation checklist – Multiquip WRS5200DFPU (KUBOTA WG972-GL-E3 DUAL FUEL) User Manual
Page 7
Advertising

wrs5200dfpu hYdrauLIC roLLer sCreed • operatIon manuaL — rev. #0 (08/18/14) — page 7
Daily Pre-oPeration checklist
Daily Pre-Operation Checklist
1
Engine oil level
2
Hydraulic oil level
3
Radiator coolant level
4
Drive tube operation
5
Strike tube operation
6
Safety stop switch operation
7
Steering control operation
Operator Trainee
COMMENTS
Advertising
This manual is related to the following products: