Instruction sheet, Prs.4tec – Prescolite LVH4 User Manual

Page 2

Advertising
background image

www

.prescolite.com

• Prescolite

TollFree

Technical Support

1.888.PRS.4TEC

• Hours: 8am - 5pm ET

Part No. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .05912700

Instruction

Sheet

101 Corporate Drive • Spartanburg, SC 29303

With representatives offices in principal cities throughout North America.

Copyright 2005, 09/05 revision, All Rights Reserved - Printed in U.S.A.

Junction

Box

Frame-In Housing

Place housing between joists, line-up self-leveling tabs

with bottom of joists as shown and hammer integral

forked nailing tabs into joists.

Leveling Tab

Electrical Wiring

Warning: Disconnect power before wiring fixture to

the circuit.

Check the transformer rating of the fixture for the

correct voltage (120V & 277V) before wiring into the

circuit.

Use one of the knock-outs provided in the J-Box for

supply wire entry. Remove J-box cover plates and

make electrical splices, black to black, white to white

and ground wire to green ground wire in J-Box. Push

splices in J-Box and replacce covers.

Electrical Rating of Fixture

LVH4120: Primary 120V. .8 AMPS

Secondary: 12V. 75VA. MAX.

LVH4277: Primary 277V. .28 AMPS

Secondary: 12V. 75VA. MAX.

CAUTION

When installing trim in housing, make sure

power and socket leads are not resting on lamp

or trim surfaces.

Close-Up

Install plasterboard

1

/

2

” to 1” Max. Cut a 4

3

/

8

” Dia. Hole in board at desired location for mounting frame trim flange.

Suspended Ceilings

Make sure that the bottom of the mounting frame is no higher than 1” above ceiling line.

Advertising