Retsch PP 25 User Manual

Page 20

Advertising
background image

Operating the machine

20

Avoid, extending the cylinder to its maximum height while the pressure is
building up.

•

Turn the threaded spindle (D) upwards.

•

Put the die tool (PW) on the pressure cylinder (J).

•

Turn the threaded spindle downwards until it rests on the die tool.

•

Close the valve (H) by turning in a clockwise direction.

•

Build up the required pressure force (t) by moving the hand lever (B)
forwards and backwards.

5.5.4

Removing the Die Tool and Tablet (1)

NOTE

A quick drop in pressure can cause the pellets to break.

•

Open the shut-off valve (H) very slowly by turning in an anti-clockwise
direction.

Fig. 5: After the Pressing Procedure

•

Pull the slide (S) out of the die tool.

Fig. 6: Ejecting the pellet

•

Close the valve (H) by turning in a clockwise direction.

S

PR

Advertising