6 • 35-3001-01 Combustible Gas Sample-Draw Detector

Installation

This section describes procedures to mount the sample-draw detector in the monitoring
environment and wire the sample-draw detector to a controller.

Mounting the Sample-Draw Combustible Gas Detector

1.

Select the mounting site. Consider the following when you select the mounting site:

Is there enough room to open the housing door and make wiring and tubing connections at
the bottom of the housing?

Make sure there is sufficient room to perform start-up, maintenance, and calibration
procedures.

Are the flowmeter and status LEDs visible?

Figure 3: Outline and Mounting Dimensions

Ø .30 x .50 (4X) M OUNTING

.78

1.13

.40

Pilot Fail

.85

.80

4.50

NOTE: Housing is 4.3 inches d eep

8.88

4.00

6.50

35-3001

www.rkiinstruments.com

Sample Drawing

Gas Detector

8.50

Advertising