Operation, Opera t ion – Bush Hog RMB 1445 User Manual

Page 68

Advertising
background image

OPERATION

RMB 1445 11/10

Operation Section 4-14

© 2010 Alamo Group Inc.

OPERA

T

ION

FRAME ASSEMBLY

•

Ensure all bolts and screws are in position and
are properly torqued.

•

Ensure all pins are in place and fastened with
screws.

•

Ensure frame is properly mounted to tractor and
hardware is properly installed and tightened.
OPS-B- 0021_H

BOOM ARM ASSEMBLY

•

Inspect condition of each arm section weldment

•

Ensure all pins are in place.

•

Ensure all bolts and screws are properly installed.

•

Check condition of teflon bushings at boom pivot
points.

•

Ensure each hydraulic cylinder is installed and retained
correctly. Ensure the proper size pins are used to
retain the cylinders in place and are secured properly.

•

Ensure that all joints are lubricated. See Maintenance
Section for Lubrication Chart. OPS-B-0022_K

Never attempt to lubricate, adjust, or remove material from the Implement while it is in
motion or while tractor engine is running.

(SG-20)

HYDRAULIC LINE INSPECTION

•

Check for hydraulic leaks along hoses,
cylinders and fittings. IMPORTANT: DO NOT
use your hands to check for oil leaks. Use a
piece of heavy paper or cardboard to check for
hydraulic oil leaks.

•

Inspect the condition of the valve weldment.

•

Ensure fitting is properly connected

•

Inspect condition of nylon bushings.

OPS-B- 0023_E

Advertising