Single tier installation instructions, Salsbury industries – Salsbury Industries 71000 Series Vented Lockers Single Tier User Manual

Page 5

Advertising
background image

Vented Lockers – 71000 Series

Single Tier Installation Instructions

Phone: 1-800-562-5377

Int’l Phone: 323-846-6700

Fax: 1-800-562-5399

Int’l Fax: 323-846-6800

www.lockers.com

[email protected]

Installation instructions are provided as general guidelines. It is advised that a professional installer be consulted. Salsbury Industries assumes no product assembly or installation liability.

Copyright © 2014 Salsbury Industries. All rights reserved. Page 5 of 5 3/27/14

SALSBURY INDUSTRIES

1010 East 62

nd

Street, Los Angeles, CA 90001-1598

Front Base Installation (Optional)

Position the front base between the front legs of the locker with the flange upward.

Assemble to the locker with #10 - 24 x 3/8” slot less screws and #10 nuts (provided).

End Base Installation (Optional)

Position the appropriate end base (right or left) behind the corresponding side legs

(right or left) of the locker with the flange upward. Assemble to the locker with #10 - 24
x 3/8” slot less screws and #10 nuts (provided). Repeat for the other side.

Advertising