Salsbury Industries 94000 Series Plastic Lockers (94168,94368 Four Tier) User Manual

Page 3

Advertising
background image

Plastic Lockers – 94000 Series

Models 94168 & 94368 Four Tier

Assembly Instructions

SALSBURY INDUSTRIES

1010 East 62

nd

Street, Los Angeles, CA 90001-1598

Phone: 1-800-562-5377 Int’l Phone: 323-846-6700

Fax: 1-800-562-5399 Int’l Fax: 323-846-6800

www.lockers.com engineering

@

lockers.com

Step 11. Slide the shelves (optional) into the slots in the locker side

panels. There are three (3) slots available for shelves in each of the

four (4) compartments.

Step 14. If two (2) or more lockers are to be installed side by side,

the lockers should be fastened together with the four (4) nuts and

long screws provided. Select any two (2) holes toward the front and
any two (2) holes toward the rear. The illustration below shows the

16 holes that are available. The lower illustration shows the inside

view of a hole and screw.

Installation instructions are provided as general guidelines. It is advised that a professional installer be consulted. Salsbury Industries assumes no product assembly or installation liability.

Copyright © 2010 Salsbury Industries. All rights reserved. (Rev. 04, 7/22/2010) Page 3 of 3

Step 12. Install the sloping hood (optional) to the top of each locker

column by aligning six (6) locating tabs with the topmost panel.

Press locating tabs into place. Illustration shows sloping hood before
pressing tabs into place. Plastic filler strips shown in step 6 are not

required on units with a sloping hood and can be discarded.

SLOPING

HOOD

SHELF

INSIDE VIEW

OF HOLE

AND SCREW

Step 13. Install placards (optional) in the indentation near the top of
each door.

The assembly of the plastic lockers is now complete.


Advertising