SATEC EM720 Installation Manual User Manual

Page 15

Advertising
background image

Chapter 2 Installation

11

Figure 11: Three Wire Open Delta Connection Using 2 PTs, 3 CTs - Wiring Setup: 3OP3

Energy is measured with 2 CTs only – Phases 1(A) and 3(C)

Figure 12: Four Wire Delta Connection Using 3 CTs - Wiring Setup: 4LL3 or 4Ln3

Advertising