Schwank comfortSchwank - Powder STW-JZ User Manual

Page 24

Advertising
background image

24

SPW-JZ, STW-JZ(2) / IWP, IW(2) I&O Manual

IM101229

RL: 13A

RD: MAY 2014

SPECIAL COUPLER INSTALLATION

1. Note the 2 holes opposite each other at

the swaged end of the first tube (flanged)

2. Install the first tube with 2 holes (swaged

end) at the 3 and 9 o’clock position, with
the welded seam located in the lower
half of tube, facing downward

3. Slide the loosened tube coupler on to the

first tube, past the swage

4. The second tube has a ¼” hole at the fe-

male end.

5. Slide second tube over swaged end of

first tube to align the hole in the second
tube with one of the holes in the first tube

6. Final alignment of the holes can be ac-

complished using a screw driver or other
tool

7. IMPORTANT: Insert ¼” rivet into the hole

to secure the tube connection

8. Slide coupler into position – half onto

each tube – covering the rivet head

9. Tighten coupler bolts to 40 ft-lb

10. Install reflectors

9.1 SPECIAL COUPLING: 175,000 & 200,000 Btuh

NOTE

: The joint of 1ST & 2ND tubes of 175,000 & 200,000 heaters experience

strong forces of expansion. Follow instructions below for special coupling of the
tubes.

FIGURE 15 SPECIAL COUPLING:



175,000 & 200,000 Btuh

- Fasten Second Tube to First Tube -

Steps 3

to 6

Step 7

Step 8

1/4” Rivet

Welded seam in
lower half of tube,
facing downward

Holes in swage of 1st

tube: locate at 3 and 9

o’clock

Advertising