Schwank STR-JZ User Manual

Page 14

Advertising
background image

14

STR-JZ I&O Manual

IM090831

RD: AUG 2009

RL: 09A- BA

90° ELBOW KIT ASSEMBLY

#1
Add the coupler to the 90° elbow over the
swaged end of the elbow.


#2
Slacken the coupler bolts. Slide the cou-
pler over the elbow from the swaged end.


#3
Add the plate hanger to the system
Important: the plate hanger must be in-
stalled with the cavity side facing up-
stream toward the burner.


#4
Install the next plate hanger (supplied
with tube kit) over the unswaged end of
the elbow with the cavity side facing up-
stream toward the burner.
(Not to be reversed)


#5
Place the reflector over the plate hang-
ers. Secure reflector to hangers with
sheet metal screws provided.

CAVITY

SIDE

INSTALLATION INSTRUCTIONS FOR 90° AND 180° ELBOW KITS

When installing systems that incorporate a 90° or 180° elbow, assembly of the system is facili-
tated by first locating and installing the elbow assembly, then install the remainder of the tube/
reflector system working away from the elbow.

FLOW DIRECTION

SWAGED END

Advertising