Page 11 – Schwank SCH-90 Construction User Manual

Page 11

Advertising
background image

GP-MCH9-BX-10C

SCH-90 / IC-90 Manual

R.D: Aug 2006

RL:10C

KH

Page 11

Clearing Burner Screen:

- Make sure gas supply is off

- Use compressed air If air is not available on the site, aerosol can is
available:

- Insert air nozzle through the pilot lighting hole at side of mantle base

- Direct at flame retaining screen, and blow out any accumulated dust

- Re-open gas supply

- Re-light pilot, and continue using the construction heater as before.

Replace filter at least:

- once every 2 weeks

- minimum once a day when sanding drywall

- each time when connecting heater at different location

* Clean burner screen with each filter change;
( see next window )


Filter replacement:

- Shut off gas supply

- Grasp filter retainer and pull together at retainer grips

- Free filter retainer

- Remove and discard filter

- Replace with a new filter

- Reinstall filter retainer, complete with filter

COMPRESSED AIR

FILTER RETAINER
& FILTER

FILTER RETAINER

FILTER

Advertising