Mise en route – Sulky VISION 2 WPB User Manual

Page 51

Advertising
background image

51

GB

Mise en route /

Start-up

/

Inbetriebsetzung

1

3

•

1

1

•

Select the EPAN menu

•

2

2

•

Check that: • the fertiliser selection is correct,

• hydraulic shutters are closed,

• the correction mode is correct (Dynamic or Static).

•

3

3

•

Select the dose/ha:

- use the numeric pad directly, validate by

.

•

4

4

•

Start spreading and select the correction ( Test or Auto).

•

5

5

•

You are spreading in DPA mode.

- You can modulate the dose/ha: select

or

and return to baseline flow rate by selecting

.

•

6

6

•

You can modulate either the right-hand side by selecting

, or the left-hand side by selecting

.

•

7

7

•

You can activate the Tribord 3D.

•

1

1

•

Select the REG menu.

•

2

2

•

Make sure that all parameters are correctly entered and saved : rate coefficient

and working width

.

•

3

3

•

Select your correction mode

.

•

4

4

•

Select TARE and reset it to zero.

•

5

5

•

Select your fertilisers

.

N

OTE

After that you can fill the fertilizer spreader hopper.

•

1

1

•

Select the INFO menu.

•

2

2

•

Select the PAR/TOT mode.

•

3

3

•

Reset each counter to zero with the RAZ or RESET function.

•

4

4

•

Upon hearing the first sound alarm and watching a bell appearing on the screen, select

to know the cause(s).

- Select OK to return to the baseline menu.

•

5

5

•

Select

if you want to save your work.

A

B

C

Advertising