Vision ii dpb : q, Uick, Start guide – Sulky VISION 2 DPB Quick set-up User Manual

Page 3

Advertising
background image

3

VISION II DPB : Q

UICK

-

START GUIDE

Réf: 400 355

- 00 - GB / DIS

03/2008

Spreading menu

Shows if the hydraulic shutters are

open or closed

Shows the type of fertiliser

Shows the position of

the electric actuators

Use these keys to modulate the

rate/ha. The 100%

key

brings you back to the initial rate.

Use to select the right, left or both
discs for modulation

Use this to control the T

RIBORD

3D.

Yield borders

Environment borders

5

5

S

ETTING THE QUANTITY PER HA

- Use the numeric keypad,

confirm with

.

(you are now ready to begin spreading)

4

4

C

ARRYING OUT A RATE CALIBRATION TEST

With the hydraulic shutters closed)

- Press on

, l, the cursor is on

CAL TEST

.

- Confirm by pressing

, the electric actuators move to mark 35,

then follow the on-screen instructions.

.

- Open the shutter.

- Let the fertiliser flow for about 15 to 20 seconds.

- Weigh the sample collected in the bucket.

- Using the numeric keypad, enter the weight and confirm with

.

The T-factor has now been updated.

4

4

5

5

Advertising