Installation, Dura-vent termination kit – Regency Hampton H27 Medium Gas Stove User Manual

Page 24

Advertising
background image

24

Hampton

®

H27 Direct Vent Freestanding Gas Stove

INSTALLATION

Pipe Length

Round Support
Box/Wall Thimble

Vertical
Terminal

Storm Collar

Flashing

(0-12/6-12)

Ceiling
Firestop

Pipe Length
(included in 46DVA-KHA)

Dura-Vent Horizontal

Termination Installation

Dura-Vent Vertical

Termination Installation

*Adj.Pipe Length
(included in #46DVA-KHA)

*90 Elbow
(included in 46DVA-KHA)

o

*Round Support
Box/Wall Thimble
(included in 46DVA-KHA)

*Horizontal

Termination Cap

(included in 46DVA-KHA)

Wall Thimble
(B) Part # 46DVA-WT

Vinyl Siding
Standoff (Optional)
Part #46DVA-VSS

Cathedral

Ceiling

Support Box

(D)

Vertical Termination Kit

Part # 46DVA-KVA

(A)

*Horizontal Termination Kit

Part # 46DVA-KHA

Basic

Horizontal Kit

1 90

o

Elbow

1 Wall

Thimble

Cover

1 Horiz. Sq. Term. Cap

DURA-VENT TERMINATION KIT

Planning Your Dura-Vent

Installation

There are two basic types of Dura-Vent Direct
Vent System installations: horizontal termination
and vertical termination. Confi rm the maximum
horizontal run and maximum vertical rise from the
diagrams in the "Venting Arrangement" section.

When planning your installation, it will be nec-
essary to select the proper length of vent pipe
for your particular requirements. For horizontal
installations, determine the minimum clearance
from the rear of the unit to the wall. It is also
important to note the wall thickness. (The wall

thimble is suitable for 2 x 4 or 2 x 6 wall construc-
tion.) Select the amount of vertical rise desired
for "vertical-to-horizontal" type installations.

Warning: Always maintain required
clearances (air spaces) to nearby
combustibles to prevent a fire
hazard. Do not fi ll air spaces with
insulation.

The minimum clearance requirements between
the outer wall of the vent pipe and nearby
combustible surfaces is 1-1/2", except when
passing through a wall, ceiling, or at the termina-
tion where the use of a fi restop or wall thimble
reduces the required clearance to 1".

Be sure to check the vent termination clearance
requirements from decks, windows, soffi ts, gas
regulators, air supply inlets and public walkways
as specifi ed in the "Exterior Vent Terminal Loca-
tions" section and in your local building codes.

To determine the length of vent pipe required
for vertical installations, measure the distance
from the unit fl ue outlet to the ceiling, the ceiling
thickness, the vertical rise in an attic or second
storey, and allow for suffi cient vertical height
above the roof line.

For multi-storey applications, fi re stops are
required at each fl oor level. If an offset is
needed, additional pipe, elbows and supports
will be required.

Do not exceed the maximum number of elbows.
One 90

o

for horizontal terminations and two 45

o

for vertical termination.

AstroCap

Part# 946-523/P

Alternate Horizontal

Termination Caps

Alternate
Horizontal
Riser Vent
Terminal
Part# 640-530/P

The FPI AstroCap

TM

is certifi ed for installations using FPI venting systems

as well as Simpson Dura-Vent® and Direct Vent Pro.

The FPI AstroCap

TM

is the proprietary trademark of FPI Fireplace

Products International Ltd.

Dura-Vent® and Direct Vent Pro are registered and/or proprietary
trademarks of Simpson Dura-Vent Co. Inc.

Advertising