Replacement parts list, Esting, Chedule – Wood’s Powr-Grip EO6VA User Manual

Page 6: Aintenance, Nspection and, Eplacement

Advertising
background image

Rev 0.0/7-12

4

EO6VA: #35195AFT

T

ESTING

S

CHEDULE

Perform these tests when installing the Power Transformer

initially

and

each time following a

repair or modification

. Correct any deficiency and retest before using the Power Transformer.

• Test the function of the Power Transformer, according to the Description in SPECIFICATIONS

and MAINTENANCE: F

USE

I

NSPECTION AND

R

EPLACEMENT

.


Note: See MAINTENANCE topics to follow for additional directions about inspecting and testing

specific Power Transformer components.

M

AINTENANCE

S

CHEDULE

Although the Power Transformer does not require maintenance on a routine basis, maintenance

must be performed whenever a deficiency is indicated by routine inspections or tests. Any
maintenance warranted must be performed before resuming normal use of the transformer.

F

USE

I

NSPECTION AND

R

EPLACEMENT

The Power Transformer has two fuses to protect the vacuum lifter's power system from current

overloading. If any powered feature does not function when the power cord is connected to the
external power source, it is likely that at least one of the fuses is blown and needs to be

replaced. Fuses are located in externally accessible holders mounted in the transformer
enclosure.
To remove a fuse for inspection, push the end of the fuse holder inward and turn it counter-

clockwise; then pull out the fuse holder's end, exposing the fuse attached to it. If the fuse is

blown, replace it with the appropriate size and type of fuse, as indicated by markings on the
blown fuse (contact Wood's Powr-Grip for assistance, if necessary). To install a fuse, reverse the
removal steps. Secure the fuse by pushing the end of the fuse holder inward and turning it
clockwise until it stops.

REPLACEMENT PARTS LIST

Stock No.

Description

Qty.

64399M

Transformer, 3 KVA, 200/208/220/380/416/440 Primary, 120/240 Secondary, 50/60 Hz

1

64398M

Transformer, 2 KVA, 200/208/220/380/416/440 Primary, 120/240 Secondary, 50/60 Hz

1

64398

Transformer, 2 KVA, 240/480 Primary, 120/240 Secondary, 60 Hz

1

64397M

Transformer, 3 KVA, 240/480 Primary, 120/240 Secondary, 60 Hz

1

64396

Transformer, 1.5 KVA, 240/480 Primary, 120/240 Secondary, 60 Hz

1

64394

Transformer, 1 KVA, 240/480 Primary, 120/240 Secondary, 60 Hz

1

SERVICE ONLY WITH IDENTICAL REPLACEMENT PARTS

SUPPLIED BY OR APPROVED BY WOOD'S POWR-GRIP CO., INC.

Advertising