Installation standard manual – Yamato Scientific BB600 Low Constant Temperature Water Bath User Manual

Page 63

Advertising
background image

60

Installation Standard Manual


* Install the unit according the procedure described below (check options and special specifications

separately).

Model Serial

number Date

Person in charge of installation

(company name)

Person in charge of

installation

Judgment

Item

Method

Reference operation manual

Judgment

Specifications

1 Accessories

Check the quantities of accessories with
the quantities shown in the Accessory
column.

Specification

P.53

Visually check the surrounding area.

Caution: Pay attention to the ambient
environment.

Keep space.

Before Using This Unit

"1. Choose a proper place
for installation
"

P.4

2 Installation

Pour water into the water bath.

Before Using This Unit

"Installation Procedure"

P.7

Operation

Before Using This Unit
"9. Always ground this unit"

P.6

Before Using This Unit
"7. Choose a correct
power distribution board or
receptacle"

P.6

1 Power

voltage

Using a tester, measure the voltage of
the voltage used by the customer
(distribution board, outlet, etc.).

Measure the voltage during operation
(the voltage must be within the
standard).

Caution: When a unit is to be connected
to the plug or breaker, use one that
conforms to the standard.

Specification

P.53

Before Using This Unit

"Installation Procedure"

P.7

2

Start of
operation

Start operation.
Set a value about 5℃ lower than the
room temperature, and check the
stabilized state of the temperature drop
time.

Check: Water leakage is not permissible.

Operation Method

P.12

Description

1

Description of
operation

Explain the operation of each unit to the
customer according to this Operation
Manual.

All

2 Error

code

Explain error codes and the procedure for
resetting them to the customer according
to this Operation Manual.

In the Event of Failure…

P.50

3

Maintenance
inspection

Explain the operation of each unit to the
customer according to this Operation
Manual.

Maintenance Method

P.47

4

Completion of
installation
Information to
be entered

Enter the date of installation and the
name of the person in charge of
installation on the face plate on the
unit.

Enter necessary information on the

guarantee, and pass it to the customer.

Explain the after-sale service route to
the customer.

After Service and

Warranty

P. 52

Advertising