Caution – Baumfolder BAUM20: 20 Kicker Assembly Installation User Manual

Page 4

Advertising
background image

TP10324A

PAGE 4

1.0 KIT INSTALLATION

Note:

This Feature is applicable only on Folders with

the DCT500 Controller Installed.

CAUTION

ELECTRICAL SHOCK HAZARD PRESENT.

THIS KIT SHOULD ONLY BE INSTALLED

BY QUALFIED PERSONNEL.

Remove electrical power from the folder at the main

circuit breaker panel. This will ensure that the installer

will not come into contact with the main power leads at

the folder disconnect switch.

If the kicker device is not assembled to the bracket, do so

with the supplied hardware per drawing TP220-889-02-00

of this manual.

Install the assembled kicker device(Figure 1-1) on the

square slitter shaft accessory spreader bar(Figure 1-2).

The location of the kicker unit is dependent on the type

and size of fold that is being made.

Figure 1

The location of the kicker unit, along the tie bar, is set so

that the striker plate(Figure 2-1) of the plunger is

approximately 1/8” from the right edge of the

stock(Figure 2-2) as it exits the slitter assembly pullout

tires(Figure 2-3).

Figure 2

After locating the kicker unit, plug the connector into the

1X12 connector located on the side of the main control

panel.

Open the door of the main control panel and find the DIN

rail located in the upper left hand corner above the blue

power transformer. Remove the hardware that attaches

the rail to the box and rotate the rail 90 degrees(Figure 3-

1).

Figure 3

Advertising