Baumfolder BAUM20: Split Guide installation User Manual

Page 2

Advertising
background image

Baumfolder Corporation 1660 Campbell Rd., P.O. Box 728 Sidney, OH USA 45365-0728

Phone: 937-492-1281 or 800-543-6107 Fax: 937-492-7280

email:

[email protected]



Install pullout wheels on ejector roller and transfer
table to guide sheet into respective marbleholders.
Note holddown assembly for crosscarrier.






















Remove existing marbleholder upper support and
install shorter marbleholder assembly onto same
bar. A lower square support bar must be mounted
between two of the crosscarrier rollers using the
existing holes found in the frames. This bar enables
proper support of the end of the shorter
marbleholder.






Advertising