Maintenance, Cleaning, Inspection – Bird Technologies 8890-300SC13-Manual User Manual
Page 22: Dc resistance, Figure 5 measuring resistance
 
Bird 8890 Series Semiconductor Termaline Coaxial Load Resistor
12
Maintenance
Cleaning
Wipe the load free of dust and dirt when necessary. Excessive dust on 
the cooling fins will interfere with heat dissipation. Clean the RF 
connector, both metallic and insulating surfaces, with a dry, non-
residue forming solvent.
Inspection
Inspect the unit every six months. Check for coolant leakage around 
the clamping band and the thermoswitch. Also check for corrosion.
DC Resistance
Measuring the dc resistance between the inner and outer conductors 
of the RF connector shows changes in the load over time, a good check 
of the load resistor’s condition. Under normal operating conditions, 
the resistor should provide at least 5,000 hours of operation before 
requiring any additional service. DC resistance tracking must start 
before the load is put into service, and should be measured annually.
Perform the following steps and record the value for future 
comparison. Make sure that you have an ohmmeter with an accuracy 
of ±1% at 50 ohms and that the load temperature is between 20 and 
25 °C (68 to 77 °F) before starting.
Figure 5
Measuring
Resistance