Installation – Bosch HGEW 36 FS User Manual

Page 10

Advertising
background image

10

13. Insert the cover panels at an angle and

tilt them back.
The bottom panel must snap in the
bolts at the back.

0

7. Screw in lower screws (hex screws).

0

8. Stick protective film over the holes of

the 2 lower mounting bolts in the
protective grid.

0

9. Connect up the air outlet pipe.

10. Connect the hood to the electricity

supply.

11. Remove the protective film from the

two flue ducts.

Take care not to damage the

surfaces which are susceptible to
scratches etc.

Warning: The interior walls of the flue

panelling can have sharp edges – Risk of
injury –.
We recommend that you wear gloves when
installing.

INSTALLATION

12. Push both sections of the flue panelling

together (slots in the upper section
must be pointing downwards) and
insert into the opening in the hood.

Protect the cover panels from

scratches, for example by laying the
template used for marking the wall over
the top edge of the lower section.

Advertising