Concrete Footings

Find the volume of concrete required for
an 200 mm x 400 mm footing that
measures 30 m in length:

KEYSTROKE

DISPLAY

o o

0.

2 0 0 Ç 9 x 4 0 0 Ç 9 =

80000.

SQ

MM

ß 6

F-AR

STORED

80000.

SQ

MM

3 0 m Ç W

(Footing)

FTG 2.4

CU

M

Concrete Volume for Driveway

Calculate the cubic meters of concrete
required to pour a driveway that measures:
14 m long x 4 m wide x 125 mm deep.
If concrete is $65 per cubic meter,
what will it cost?

KEYSTROKE

DISPLAY

o o

0.

1 4 m

14

M

x 4 m

4

M

x 1 2 5 Ç 9 =

7

CU

M

x 6 5 Ç 0

(Cost)

$455.

00

(total cost)