Installation, Unpacking – Briggs & Stratton 71017 User Manual

Page 6

Advertising
background image

INSTALLATION

6

INSTALLATION

Unpacking

Delivery Inspection

Remove the Transfer Switch components shown in
Figure 1 from the shipping carton.

The transfer switch is supplied ready for installation.
Inspect the switch and its attached components for any
shipping damage.

The inlet box is supplied ready to be wired. Inspect it,
the connection cord set, and the connecting plugs for
any damage. The installer will select and connect the
appropriate connection cord plug to match generator
receptacle.

IMPORTANT: If loss or damage is noted at time of
delivery, have the person(s) making delivery note all
damage on the freight bill and affix his signature under the
consignor's memo of loss or damage. If loss or damage is
noted after delivery, contact the carrier for claim
procedures. Freight damaged parts are not warranted.

Items Not Shipped with Transfer Switch:

The following items, required for system installation,
are not included and must be provided by the installer:

1.

Tools required for installation

2.

Anchors and screws to mount the transfer switch
components and conduit.

3.

Conduit, fittings, wire nuts, and insulated copper
wire for connecting the transfer switch to the
outside inlet box and main distribution panel.

Inlet Box

Connecting Cord Set

Transfer Switch
(Model 071014 shown)

Manual

Connecting Plugs

Figure 1 — Transfer Switch Components

Advertising
This manual is related to the following products: